← Back to catalog
Cover image for Site & Dungeon Generator

Site & Dungeon Generator

Site & Dungeon Generator is a browser-based tool for quickly generating explorable locations for your TTRPG sessions — no installation required, works entirely offline as a single HTML file. DIRECT ACCESS HERE: https://vanishing-vault.github.io/sd-generator.html It is based on these two methods: Sites (from Mythic Bastionland) — generates a hex-based point crawl with typed nodes (Features, Dangers, Treasures), typed routes (Open, Closed, Hidden), and entrance markers, laid out as a visual diagram. Bite-Sized Dungeons (from Traverse Fantasy) — generates a compact six-room dungeon using OSR stocking principles, with a randomised graph topology, connection lengths, and room types balanced for meaningful play. Each generated location comes with a visual diagram and a text panel with editable titles, descriptions, and spark tables — two d20 columns of evocative words designed to fuel improvisation at the table. Locations can be exported as PDF or PNG, and you get both the diagram and the node notes. A site node can be expanded directly into a dungeon — the node's type and spark values seed the dungeon's room prompts and stocking. All prompt and spark tables are fully editable via the configuration tab, with JSON import and export for sharing custom table sets.

Vanishing Vault 2 games· 86 followers· 10 ratings· portfolio 49 View creator →
PLAY IN BROWSER
ItchDB signals
★ 5 avg rating
4 ratings +0 / 7d
4 comments +0 / 7d
Catalog standing Top 24%
#103,907 of 439,094most rated

Ratings over time

Cumulative · 30d
4 30d ago today
Cumulative ratings

Comments over time

Cumulative · 30d
4 30d ago today
Cumulative comments

Screenshots

1 / 5
Screenshot 1 for Site & Dungeon Generator
Screenshot 2 for Site & Dungeon Generator
Screenshot 3 for Site & Dungeon Generator
Screenshot 4 for Site & Dungeon Generator
Screenshot 5 for Site & Dungeon Generator